Loading...
Loading...

THỐNG KÊ TRUY CẬP

  • : 0
  • : 0

Project Highlight: Turnaround at GPP Ca Mau – PV GAS (2022)

21/05/2025

Project Highlight: Turnaround at GPP Ca Mau – PV GAS (2022)

  • Client: PV GAS – Gas Services Company

  • Location: Ca Mau Gas Processing Plant (GPP Ca Mau), Vietnam

  • Execution Time: 2022

  • Turnaround Duration: 10 days

???? Scope of Work:

The turnaround scope covered comprehensive inspection, testing, and evaluation of static equipment and piping systems in accordance with:

  • API 510 – Pressure Vessel Inspection

  • API 570 – Piping Inspection

  • API 653 – Storage Tank Inspection

The following NDT methods and advanced techniques were applied:

  • Conventional NDT: UT, RT, MT, PT, VT

  • Advanced NDT: PAUT, MFL, IRIS, RFT, ECT

  • Other services: UTM, Hydrojet Cleaning, Hardness Testing, Replica Metallography

Key Achievements:

  • Completed inspection of over 25 major equipment items within a tight 10-day shutdown window.

  • Ensured zero safety incidents and fully compliant with ASME/API standards.

  • Delivered professional reports supporting safe and timely plant re-commissioning.

tin tức LIÊN QUAN

NONDESTRUCTIVE TESTING
NONDESTRUCTIVE TESTING